Topic · Environmental · Maine · public record

Watershed protection overlay across Maine

What this decidesWhether a parcel carries an overlay constraint, and whether the boundary or the conditions are being redrawn.

Overlay districts restricting what can be built near a drinking-water supply or a sensitive watershed: setbacks, impervious-surface limits, septic and stormwater conditions, and aquifer protection rules.Our definition of the class.

38
towns on the record
401
events on the record
290
in the last 90 days

What this page is for one topic across Maine's municipalities on the public record: where it is moving, which towns carry it, the documents behind it. A subscriber sees it cut to their own towns and questions. If it does not, write to us; that is what changes the next edition.

Where it is on the record38 towns, most movement first

Every town carrying this class on the record through 2026-08-31: events in the last 90 days against the 90 before, the same 90-day count as a rolling line, whose right-hand point is that number, the latest document.
Eliot50 events34 in 90 days ▲ +112.5%latest 2026-08-07, Conservation Commission Regular Meeting Agenda (PD
Bar Harbor40 events34 in 90 dayslatest 2026-08-07, Minutes — Town Council
Wiscasset52 events33 in 90 days ▲ +73.7%latest 2026-08-07, Climate Action Team - 01.28.2026
North Yarmouth49 events32 in 90 days ▲ +88.2%latest 2026-08-07, Select Board Meeting Agenda
Winthrop47 events32 in 90 days ▲ +128.6%latest 2026-08-07, Planning Board Meeting Agenda (PDF)
Cumberland39 events32 in 90 dayslatest 2026-08-07, Agenda center file Comprehensive Plan Committee Me
Auburn35 events32 in 90 dayslatest 2026-08-30, City Committees — Minutes 6 16 26 Approved
Yarmouth35 events31 in 90 dayslatest 2026-08-06, Planning Board — 5-27-2026 Minutes
Falmouth8 events6 in 90 dayslatest 2026-08-30, Public comment for 241A Foreside application_ Dan
Harpswell3 events3 in 90 daysnew on the recordlatest 2026-07-18, AGENDA06.18.26
Biddeford3 events2 in 90 days ▲ +100.0%latest 2026-08-31, Planning Board Application
Brunswick3 events2 in 90 daysnew on the recordlatest 2026-08-31, Mare Brook Watershed Committee Charge
Harrison3 events2 in 90 days ▲ +100.0%latest 2026-08-03, Shoreland Zoning Ordinance
Jefferson3 events2 in 90 days ▲ +100.0%latest 2026-08-22, April 7, 2026 PB Agenda
Augusta2 events2 in 90 daysnew on the recordlatest 2026-08-31, 6 8 26 AR 1780949479
Acton2 events1 in 90 days ▬ +0.0%latest 2026-07-18, Zoning Ordinance 04-11-2026
Portland2 events1 in 90 days ▬ +0.0%latest 2026-08-24, Sustainability & Transportation Committee Meeting
Calais1 event1 in 90 daysnew on the recordlatest 2026-08-24, Floodplain Ordinance
Edgecomb1 event1 in 90 daysnew on the recordlatest 2026-07-18, Revised Shoreland and Site Plan Review Packet (PDF
Kennebunk1 event1 in 90 daysnew on the recordlatest 2026-08-05, AgendaCenter agenda
Madawaska1 event1 in 90 daysnew on the recordlatest 2026-08-14, Agenda
Patten1 event1 in 90 daysnew on the recordlatest 2026-08-24, 906D92 3Db68F0502E64A158Cb23A4A5E5Acdd5
Shapleigh1 event1 in 90 daysnew on the recordlatest 2026-08-14, Shoreline Zoning Buffer Standards Municipal and DE
South Portland1 event1 in 90 daysnew on the recordlatest 2026-08-31, Site Plan with Shoreland Zoning - Carroll Associat
Warren1 event1 in 90 daysnew on the recordlatest 2026-07-19, boards-committees_responsibilites_62226.pdf
York1 event1 in 90 daysnew on the recordlatest 2026-08-05, AgendaCenter minutes
Mount Desert3 events0 in 90 dayslatest 2026-04-24, Selectboard Meeting
Belfast2 events0 in 90 dayslatest 2026-04-09, March 18, 2026 Agenda
Rockport2 events0 in 90 dayslatest 2026-04-24, 2026.03.26 PB Minutes DRAFT
Bangor1 event0 in 90 dayslatest 2026-01-21, Infrastructure Committee Regular Meeting Agenda (P
Bridgton1 event0 in 90 dayslatest 2026-04-15, 2.3.26 Minutes
Caribou1 event0 in 90 dayslatest 2026-02-26, Agenda/Packet
Casco1 event0 in 90 dayslatest 2026-05-04, Meet Agenda 0Cf5C2B496Ad40E18B2Bb5043D1Ee6D2
Limington1 event0 in 90 dayslatest 2026-04-10, Download
Paris1 event0 in 90 dayslatest 2026-04-10, Download
Turner1 event0 in 90 dayslatest 2026-04-11, Comprehensive Plan 2024
Woolwich1 event0 in 90 dayslatest 2026-04-22, Building Permit

Who this typically touches

Business types a matter in this class typically reaches. Our inference from the class, not the record's words; a specific organization is named on these pages only when the record itself names it.

Likely to gain: environmental and civil engineering firms (overlay conditions are usually met with a study or a designed system).

Likely affected: developers and landowners inside the overlay (the overlay sets what can be built and how much of a site can be paved).

Worth watching: water districts and public water suppliers (the overlay is normally drawn around their source).

One scope up

The same class at a wider scope: Watershed protection overlay in New Hampshire · Watershed protection overlay in Maine · Watershed protection overlay in Massachusetts · Watershed protection overlay in Vermont · Watershed protection overlay in Connecticut · Watershed protection overlay in Illinois · Watershed protection overlay across the country.

Counts and dates are taken from the documents on the record in this window. The class and its definition are ours.